News & Updates
Current Projects
Industrial Plant
Commercial Complexes
Hospitality and Tourism
Transportation
Urban Infrasructure
Textile

Our Vision:
To be a leading global consultant for development and management of infrastructure as well as a catalyst in national development and growth.

Mission Statement:
At Wadia Techno-Engineering Services Limited I am a part of Wadia Family of International Repute. Our sole aim is to satisfy all clients all clients to the best of our ability. Our prime focus is continual improvement. I will also endeavor to perform as per highest standards laid down by Wadia Techno-Engineering Services Limited And I will work for the development of our organisation and for the betterment of society in general.

Quality Policy:
“We, at Wadia Techno-Engineering Services Limited are earnestly committed to provide Consultancy in Architecture, Engineering Designs and Project Management of superior Quality to meet customer and expectations. We shall strive to contribute our skills and talents composed of experience and high integrity to provide the finest quality service and continually improve the Quality Management System to Total Customer Satisfaction.”

 

 

Transportation
Project Name:   Flyover at Nerul Junction on Sion – Panvel Highway for MSRDC
Client: Maharashtra State Road Development Corporation (MSRDC) Mumbai
Location: Nerul, Navi Mumbai, Maharashtra
Project Description:

Flyover having open foundations for piers/footing, 6-lane divided two-way carriageway having total width of 24.20 m, P.S.C. box girders for obligatory span (2 obligatory spans of length 35m each) & P.S.C. pre-tensioned “I” girders in viaduct spans 9 (25 viaduct spans of approx. 1.55m each), RCC retaining wall with earth fills for approach ramps, length of flyover between the abutments 508.62 m and the length of the solid ramps & valley curves 231.94 m on Sion side and 140.42 m on Panvel side. Total length of flyover 881 m.

Services Offered:

Project management consultancy services including proof consultancy, detailed topographic survey of existing carriage way with reference to the proposed flyover, go-technical investigations for design of flyover foundations, quality assurance plan, quality control procedures and check lists, monitoring the implementation of the quality management system.